AEDÂ
Mechanical Engineer- 3 years(1 year GCC) experienced in Piping Projects
- Salary: After Interview
- City: Dubai
- Profession: Engineering
- Listed: July 27, 2019 9:14 pm
- Expires: This ad has expired
Description
Mechanical Engineer having 3 years(1 year GCC) experience as Project Engineer in Piping projects, seeking a job. Currently looking for a suitable opening, where I can effectively contribute my skills and abilities for the growth of organization along with constant development throughout my career.
Experience:
Project Engineer at Pipetech Services PVT Ltd
L&T MFY LLC for Al Zour Refinery Project (KIPIC, Package V, SC- 0931), Sohar, Oman
-Planning, organizing, and execution of piping fabrication, erection, and hydro-testing on Pre-assembled pipe rack Offshore modules (Worth 30,000inchdia).
-Ensuring quality as per the standards (SHELL DEP).
-Coordination with various departments as a single point conflict resolution.
-Submits site daily reports, production plan, inspection requests, estimates and all applicable monitoring reports on a regular basis or as required.
-Formulating reconciliation plan in liaison with the client and executing it.
Production Manager at Beepath Castings PVT Ltd (KENZA GROUP), Kerala, India
-Planned, organized and implemented production plan for steel melting unit (Induction melting-8T).
-Oversaw production processes and re-negotiated timescales or schedules as necessary.
-Increased production (15%) by implementing innovative ideas and reorganizing production methods.
-Ensured quality of product and raw materials as per the standards (IS 2830)
-Organized repair and routine maintenance of production equipment.
-Prepared and submitted production, inspection and other reports on a weekly basis or as required.
Site Engineer (Mechanical) at Sahicon Engineering and Trading
EPCC (ESSAR) for Bhilai Steel Plant (SAIL), Chhattisgarh, India
-Erection, Alignment, and testing of static and rotary equipment, piping and ducts of Continuous Casting Platform for billet and bloom (25,000MT).
-Planned and implemented works with approved construction drawings, ensuring quality as per the standards.
-Hydrostatic, hydraulic and pneumatic testing of piping, ducts, hydraulic cylinders, and equipment.
-Submitted daily reports, inspection reports, and monthly billing invoice.